🏗️ Jobsite Shuffle: Building Pad
Scenario:
A crew is preparing a site for a new commercial building. The equipment is ready to go, but the work plan has been shuffled. Can you put the construction tasks in the correct order?
Put these 8 steps in the correct order:
• A. Compact the finished building pad
• B. Strip and stockpile topsoil
• C. Rough-grade the building area
• D. Clear trees, brush and debris
• E. Place and spread suitable fill material
• F. Excavate unsuitable soil
• G. Finish-grade the building pad
• H. Bring in additional fill material